On-site coordination in Aomori

25/09/2021

I visited the Rokkasho Village kindergarten to check the installation and adjustment of the EL panel.

The cable thickness that arrived at the site was different from the sample that was confirmed,

so I had to adjust the design at short notice.

In the end, I made some slight adjustments to the design and changed the installation height.

I feel that it's a bit strange that the cable size is different from the sample!

The cable and connector are exposed, so it has a see-through light material design.

Hmm.