Due to COVID, the work site has not progressed well②

27/08/2022

I was relieved to get the lighting effect I wanted.

This is an office lighting site where I was involved as a lighting consultant and designer. The site I was involved in had been halted for about six months since before COVID-19. I visited to check the lighting on the first floor, including when each floor was coming into view. I was involved in experiments and proposing design panels. This was a site where I made discoveries and took on challenges while verifying various things. There are still some areas to check, but this was the first step.