Due to COVID, the work site has not progressed well①

27/08/2022

The full picture of a certain office lighting design is beginning to come into view.

We have been working on lighting for a certain office since before COVID-19. This is a site where we have been involved from the design stage for four floors, including the parking lot. Some lighting has been installed, but the entire interior is now visible, so we visited the site to check it out. By the way, our staff (son) was also involved in the design, so it was a very helpful site to confirm the architectural image, lighting image, and construction details. There were some parts that we were concerned about, but we would like to check them again in the final inspection. *The photos were taken by a staff member. As expected, the ceiling surface was the main focus.